22195Express
Virangna Laxmibai Jhansi Bandra (T) Express
Virangana Lakshmibai Jhansi VGLJ → Bandra (T) BDTS
2026 published timetable · origin operating days: Mon, Sun. Principal timing points only. Positions in 3D are simulated; check current railway information before travel.
- Departs
- 16:50
- Arrives
- 16:10 day 2
- Est. distance
- 1,189 km
- Journey
- 23h 20m
- Timing points
- 10
- Est. avg speed
- 51 km/h
Route
Coach layout 23 vehicles
- WAP-7
- SLR
- GS
- GS
- A1
- A2
- B1
- B2
- B3
- B4
- B5
- S1
- S2
- S3
- S4
- S5
- S6
- S7
- S8
- PC
- GS
- GS
- SLR
2× Guard / Luggage, 4× General, 2× AC 2-Tier, 5× AC 3-Tier, 8× Sleeper, 1× Pantry Car. Typical rake for this service type; actual composition varies.
Published timings 10 points
| # | Station | Arr | Dep | Halt | Day | km |
|---|---|---|---|---|---|---|
| 1 | Virangana Lakshmibai Jhansi VGLJ | — | 16:50 | 1 | 0 | |
| 2 | Gwalior GWL | — | 18:50 | 1 | 93 | |
| 3 | Shivpuri SVPI | — | 20:25 | 1 | 195 | |
| 4 | Guna GUNA | — | 22:10 | 1 | 289 | |
| 5 | Ujjain UJN | 03:50 | 04:00 | 10m | 2 | 514 |
| 6 | Nagda NAD | 05:08 | 05:10 | 2m | 2 | 562 |
| 7 | Ratlam RTM | 06:05 | 06:15 | 10m | 2 | 602 |
| 8 | Vadodara BRC | 10:05 | 10:15 | 10m | 2 | 825 |
| 9 | Surat ST | 12:25 | 12:30 | 5m | 2 | 952 |
| 10 | Bandra (T) BDTS | 16:10 | — | 2 | 1,189 |
Times are IST; days count from departure at origin. A dash means that arrival or departure is not printed. Principal timing points only, not every halt. Distances are straight-line estimates between listed timing points.