17625Express
Kacheguda Repalle Express
Kacheguda KCG → Repalle RAL
2026 published timetable · origin operating days: Daily. Principal timing points only. Positions in 3D are simulated; check current railway information before travel.
- Departs
- 22:20
- Arrives
- 06:15 day 2
- Est. distance
- 293 km
- Journey
- 7h 55m
- Timing points
- 4
- Est. avg speed
- 37 km/h
Route
Coach layout 16 vehicles
- WAP-7
- SLR
- GS
- GS
- S1
- S2
- S3
- S4
- S5
- S6
- S7
- S8
- PC
- GS
- GS
- SLR
2× Guard / Luggage, 4× General, 8× Sleeper, 1× Pantry Car. Typical rake for this service type; actual composition varies.
Published timings 4 points
| # | Station | Arr | Dep | Halt | Day | km |
|---|---|---|---|---|---|---|
| 1 | Kacheguda KCG | — | 22:20 | 1 | 0 | |
| 2 | Guntur GNT | 04:10 | 04:15 | 5m | 2 | 239 |
| 3 | Tenali TEL | 04:40 | 04:45 | 5m | 2 | 262 |
| 4 | Repalle RAL | 06:15 | — | 2 | 293 |
Times are IST; days count from departure at origin. A dash means that arrival or departure is not printed. Principal timing points only, not every halt. Distances are straight-line estimates between listed timing points.