12910Garib Rath
Nizamuddin Bandra (T) Garibrath Express
Nizamuddin NZM → Bandra (T) BDTS
2026 published timetable · origin operating days: Wed, Fri, Sun. Principal timing points only. Positions in 3D are simulated; check current railway information before travel.
- Departs
- 16:30
- Arrives
- 09:15 day 2
- Est. distance
- 1,248 km
- Journey
- 16h 45m
- Timing points
- 8
- Est. avg speed
- 75 km/h
Route
Coach layout 19 vehicles
- WAP-7
- EOG
- G1
- G2
- G3
- G4
- G5
- G6
- G7
- G8
- G9
- G10
- G11
- G12
- G13
- G14
- G15
- G16
- EOG
2× Power Car, 16× AC 3-Tier. Typical rake for this service type; actual composition varies.
Published timings 8 points
| # | Station | Arr | Dep | Halt | Day | km |
|---|---|---|---|---|---|---|
| 1 | Nizamuddin NZM | — | 16:30 | 1 | 0 | |
| 2 | Mathura MTJ | 18:03 | 18:05 | 2m | 1 | 129 |
| 3 | Kota KOTA | 21:15 | 21:20 | 5m | 1 | 436 |
| 4 | Ratlam RTM | 00:15 | 00:18 | 3m | 2 | 661 |
| 5 | Vadodara BRC | 03:55 | 04:05 | 10m | 2 | 884 |
| 6 | Surat ST | 05:37 | 05:42 | 5m | 2 | 1,011 |
| 7 | Borivali BVI | 08:23 | 08:25 | 2m | 2 | 1,230 |
| 8 | Bandra (T) BDTS | 09:15 | — | 2 | 1,248 |
Times are IST; days count from departure at origin. A dash means that arrival or departure is not printed. Principal timing points only, not every halt. Distances are straight-line estimates between listed timing points.