12480Express
Bandra (T) Jodhpur Suryanagari Express
Bandra (T) BDTS → Jodhpur JU
2026 published timetable · origin operating days: Daily. Principal timing points only. Positions in 3D are simulated; check current railway information before travel.
- Departs
- 13:25
- Arrives
- 05:15 day 2
- Est. distance
- 903 km
- Journey
- 15h 50m
- Timing points
- 12
- Est. avg speed
- 57 km/h
Route
Coach layout 23 vehicles
- WAP-7
- SLR
- GS
- GS
- A1
- A2
- B1
- B2
- B3
- B4
- B5
- S1
- S2
- S3
- S4
- S5
- S6
- S7
- S8
- PC
- GS
- GS
- SLR
2× Guard / Luggage, 4× General, 2× AC 2-Tier, 5× AC 3-Tier, 8× Sleeper, 1× Pantry Car. Typical rake for this service type; actual composition varies.
Published timings 12 points
| # | Station | Arr | Dep | Halt | Day | km |
|---|---|---|---|---|---|---|
| 1 | Bandra (T) BDTS | — | 13:25 | 1 | 0 | |
| 2 | Borivali BVI | — | 13:45 | 1 | 19 | |
| 3 | Surat ST | 16:40 | 16:45 | 5m | 1 | 237 |
| 4 | Vadodara BRC | 18:16 | 18:21 | 5m | 1 | 364 |
| 5 | Ahmedabad ADI | 20:25 | 20:35 | 10m | 1 | 463 |
| 6 | Mahesana MSH | 21:50 | 21:52 | 2m | 1 | 531 |
| 7 | Palanpur PNU | — | 23:25 | 1 | 594 | |
| 8 | Abu Road ABR | 00:01 | 00:11 | 10m | 2 | 642 |
| 9 | Falna FA | 01:35 | 01:37 | 2m | 2 | 738 |
| 10 | Marwar MJ | 02:45 | 02:50 | 5m | 2 | 804 |
| 11 | Luni LUNI | 03:59 | 04:02 | 3m | 2 | 872 |
| 12 | Jodhpur JU | 05:15 | — | 2 | 903 |
Times are IST; days count from departure at origin. A dash means that arrival or departure is not printed. Principal timing points only, not every halt. Distances are straight-line estimates between listed timing points.